Questionnaire

 

1        Introduction

 

My name is [removed because peer-review process] ……………………………………………………………….. I am reaching out to you kindly to request assistance for my research by answering the following questionnaire. The objective is to collect data on social housing multifamily civil construction projects (such as "Minha Casa, Minha Vida") to establish a national benchmarking of constructability for these projects.

The data collected through this questionnaire, as outlined in the previously presented Informed Consent Form (ICF), will be used solely for academic purposes. The information gathered will not be associated with a specific construction company or individual in the published results, and by itself, it will not allow identification of the company or you. The generated results can be shared with you upon request (please notify the researcher if interested).

When responding to the questionnaire, please consider a specific social housing multifamily development project, whether in the design phase, under construction, or already completed.

Thank you very much!

 

▪️ What is your role in the company? Please check all applicable options:

 

 Architect

 Civil Engineer

 Industrial Engineer

 Director

 Owner

 Other

 

▪️ The project for which you are responding to this questionnaire:

 

 In the design / feasibility phase

 Under construction

 Already completed

 

 

2        Questions only for projects under construction / already completed

 

▪️ Is there a standardization of construction methods? This standardization involves maintaining the same execution method by the operational team, aiming for consistent results (e.g., same method for subflooring, same method for plastering, as an executive standard aiming for consistent quality).

 

 Yes

 No

 Other...

 

▪️ How many progress meetings occur/occurred about the building works?

 

 None | They do not occur/occurred.

 1 per week.

 1 every two weeks.

 1 per month.

 1 every 45 days.

 1 every two months.

 1 every three months.

 1 every four months.

 Other...

 

▪️ Regarding stocks:

 

 Made in sufficient quantity and within the site itself.

 The site had a lot of material in stock or for other neighboring sites.

 Other.

 

▪️ Were there production design (like ceramic tiling layout)?

 

 Yes

 No

 

▪️ Was there a construction site layout design?

 Yes

 No

 

▪️ Did the site location prevent any construction solution?

 Yes

 No

 Other...

 

▪️ What vertical transportation method is (or was) used? Check all applicable.

 

 Crane

 Elevator (cable or rack and pinion)

 Column hoist

 Rope and pulley

 Other...

 

▪️ Was the structure reinforced concrete cast in situ (columns/beams/slabs)?

 

 Yes

 No

 

3        Specific Questions - Cast in Situ Reinforced Concrete Structure

 

▪️ Could you describe the formwork system for beams and columns? Check all that apply.

 

 Sawn timber

 Resin-coated plywood / plywood

 Plastic-coated plywood / plywood

 Other...

 

▪️ Could you describe the formwork system for slabs? Check all that apply.

 

 Sawn timber

 Resin-coated plywood / plywood

 Plastic-coated plywood / plywood

 Ribbed slab with clay pots

 Ribbed slab with EPS/foam

 Hollow-core slab with ceramic tiles and joists

 Other...

 

▪️ Could you describe the concrete pouring system used? Check all that apply.

 

 On-site mixed concrete with concrete mixer

 Ready-mixed concrete poured

 Pumped ready-mixed concrete

 Other...

 

▪️ Could you describe the shoring system used? Check all that apply.

 

 Sawn timber

 Wooden forks

 Metal shoring

 Metal tower shoring

 Other...

 

▪️ Where was the reinforcement assembled? Check all that apply.

 

 Cut and bent on-site

 Purchase of pre-cut and pre-bent reinforcement

 Other...

 

▪️ Could you provide the structural design drawings? The use of the file will be exclusively for calculating indicators, not for commercial purposes, sharing with third parties, or for publication in the PhD thesis. The company or name of designer will not be disclosed.

 

[INSERT FILE]

 

4        Specific Questions - All Projects

 

▪️ How were the projects developed?

 

 All in BIM

 Part in CAD, part in BIM

 All in CAD

 

▪️ Were the projects shared among designers using a cloud platform?

 

 Yes

 No

 I don't know, projects were contracted from an external office

 

▪️ Was there a project coordinator involved?

 

 Yes

 No

 Other...

 

▪️ Were there curved elements (circular windows or with arch details, curved parts of walls or beams) on the facade?

 

 Yes

 No

 

▪️ Are there (were there) complete and sufficient material/component brands and specifications to be used? If any specification was insufficient, please describe under "Other".

 

 Yes

 No

 Other...

 

▪️ Could you provide the typical floor plan of the architectural design? The document will be used restrictively, not published or shared with third parties, solely for gathering indicators related to the form and dimensions of the building. The company or name of the designer will not be disclosed.

 

[INSERT FILE]

 

▪️ What type of wall was used in the project? You can select more than one option if applicable.

 

 Cast in situ reinforced concrete wall

 Lightweight concrete panel or cellular concrete

 Light steel frame

 Naval partition

 Precast concrete wall

 Drywall

 Structural masonry (ceramic or concrete block)

 Conventional masonry (non-structural, ceramic or concrete block)

 Other...

 

▪️ Were there finishes applied to the wall? If yes, which ones?

 

______________________________________________

 

▪️ What was the structural system used? You can select more than one option if applicable.

 

 Precast concrete

 Light steel frame

 Steel structural system

 Cast in place reinforced concrete

 Precast concrete wall

 Structural masonry (in ceramic or concrete block)

 Cast in place reinforced concrete wall

 Other...

 

▪️ What type of roof was used? You can select more than one option if applicable.

 

 Roof slab without traditional roofing

 Integrated metal roof on metal truss/rafter (sandwich tile roofs with metal lining below and intermediate acoustic insulation).

 Conventional metal roof on metal or wooden truss/rafter

 Fiber cement roof on metal or wooden truss/rafter

 Metal roof on fixed joint to cast in place beams

 Ceramic tiles on fixed joint to cast in place beams

 Other...

 

▪️ Does the company maintain a database of solutions that have higher constructability (easier to build)?

 

 Yes

 No

 

▪️ In your company, is there interaction between the site engineer and designers to discuss what is easier or harder to execute on-site?

 

______________________________________________

 

▪️ Do you think this interaction would be important? Why?

 

______________________________________________

 

▪️ From your experience, what makes one project easier or harder to execute than another?

 

______________________________________________

 

If you wish to receive the research results in the future, after analysis and publication in a scientific journal, please email the researcher at email@emailofresearcher.com with the subject "Constructability Benchmark Research Results".

 

[End of questionnaire]